Set Grid Plan Component Step

From PMDOWiki
Revision as of 21:59, 10 August 2025 by Imbion (talk | contribs) (Created page with "The '''Set Grid Plan Component Step''' is a floor generation step. Its typical priority is '''-4'''. == Usage == This step tags all rooms that meet its qualifications with a component tag. == Fields == The following fields are present in this step. === Filters === The qualifications that must be met in order for a room to be tagged. For more information, see Filter. === Components === The components the rooms will be tagged with. For mo...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

The Set Grid Plan Component Step is a floor generation step. Its typical priority is -4.

Usage

This step tags all rooms that meet its qualifications with a component tag.

Fields

The following fields are present in this step.

Filters

The qualifications that must be met in order for a room to be tagged. For more information, see Filter.

Components

The components the rooms will be tagged with. For more information, see Component Tag.