Set Grid Plan Component Step: Difference between revisions
From PMDOWiki
Created page with "The '''Set Grid Plan Component Step''' is a floor generation step. Its typical priority is '''-4'''. == Usage == This step tags all rooms that meet its qualifications with a component tag. == Fields == The following fields are present in this step. === Filters === The qualifications that must be met in order for a room to be tagged. For more information, see Filter. === Components === The components the rooms will be tagged with. For mo..." |
No edit summary |
||
| Line 2: | Line 2: | ||
== Usage == | == Usage == | ||
This step tags all rooms that meet its qualifications with a component tag. | This step tags all rooms that meet its qualifications with a component tag in a [[GridFloorGen]] floor. | ||
== Fields == | == Fields == | ||
Latest revision as of 22:00, 10 August 2025
The Set Grid Plan Component Step is a floor generation step. Its typical priority is -4.
Usage
This step tags all rooms that meet its qualifications with a component tag in a GridFloorGen floor.
Fields
The following fields are present in this step.
Filters
The qualifications that must be met in order for a room to be tagged. For more information, see Filter.
Components
The components the rooms will be tagged with. For more information, see Component Tag.
