Set Grid Plan Component Step: Difference between revisions

From PMDOWiki
Imbion (talk | contribs)
Created page with "The '''Set Grid Plan Component Step''' is a floor generation step. Its typical priority is '''-4'''. == Usage == This step tags all rooms that meet its qualifications with a component tag. == Fields == The following fields are present in this step. === Filters === The qualifications that must be met in order for a room to be tagged. For more information, see Filter. === Components === The components the rooms will be tagged with. For mo..."
 
Imbion (talk | contribs)
No edit summary
 
Line 2: Line 2:


== Usage ==
== Usage ==
This step tags all rooms that meet its qualifications with a component tag.
This step tags all rooms that meet its qualifications with a component tag in a [[GridFloorGen]] floor.


== Fields ==
== Fields ==

Latest revision as of 22:00, 10 August 2025

The Set Grid Plan Component Step is a floor generation step. Its typical priority is -4.

Usage

This step tags all rooms that meet its qualifications with a component tag in a GridFloorGen floor.

Fields

The following fields are present in this step.

Filters

The qualifications that must be met in order for a room to be tagged. For more information, see Filter.

Components

The components the rooms will be tagged with. For more information, see Component Tag.