Add Disconnected Rooms Step: Difference between revisions

From PMDOWiki
Imbion (talk | contribs)
Created page with "The '''Add Disconnected Rooms Step''' is a floor generation step. Its typical priority is '''-2.2'''. == Usage == This step takes the current floor plan, and then adds new rooms disconnected from the existing rooms. == Fields == This step has the following fields. === Amount === The range of amount of disconnected rooms. === Generic Rooms === The rooms that can spawn. === Components === The component tags to apply to the spawned rooms. For more information..."
 
Imbion (talk | contribs)
Redirected page to Add Disconnected Rooms Steps
Tag: New redirect
 
Line 1: Line 1:
The '''Add Disconnected Rooms Step''' is a [[floor generation step]]. Its typical priority is '''-2.2'''.
#REDIRECT [[Add Disconnected Rooms Steps]]
 
== Usage ==
This step takes the current floor plan, and then adds new rooms disconnected from the existing rooms.
 
== Fields ==
This step has the following fields.
=== Amount ===
The range of amount of disconnected rooms.
=== Generic Rooms ===
The [[room|rooms]] that can spawn.
=== Components ===
The component tags to apply to the spawned rooms. For more information, see [[Component Tag|component tag]].
 
[[Category:Floor Generation Step]]

Latest revision as of 18:37, 13 August 2025